AnsweredQ&A #1336542015-07-09 10:39 · Views 422

Adding rubble replacement to drain pipe body quantities

배수관 구체수량에서 잡석치환수량 추가방법을 알고 싶습니다. 답변부탁드립니다.

Answer

암거 기본자료 입력 창에서 수정 버튼을 누르신후 잡석깔기의 콤보 값을 적용으로 바꾸시면 됩니다.

Attached images 1

More in this list

StatusProductNo.TitleViewsDate
AnsweredARcBridge#133674Part of the pile check report is not output3682015-07-10
AnsweredAAbutPier#133671Column tie bar check3662015-07-10
AnsweredAAbutPier#133662Column tie bars and coping shear rebar spacing1442015-07-10
AnsweredAAbutPier#133667Question about structural calculation error3022015-07-10
AnsweredAAbutPier#133664Applying moments from P-delta analysis7102015-07-09
AnsweredARoad#133677Concrete structural design code5752015-07-09
AnsweredACulvert#133648Error in seismic analysis, cause unknown7012015-07-09
Answered양배수장#133648Error in seismic analysis, cause unknown7012015-07-09
AnsweredACulvert#133656Drawing and rebar quantity errors2822015-07-09
AnsweredAAbutPier#133655Question about applying railway loads2482015-07-09
Answered#133654Adding rubble replacement to drain pipe body quantities · Currently viewing4222015-07-09
AnsweredAWall#133653Spread footing check4252015-07-09
AnsweredARcBridge#133650Pile check output error in calculation report2992015-07-09
AnsweredAWall#133649Drawing output5062015-07-09
AnsweredACulvert#133631About wing walls3182015-07-08
Answered#133639Parallel wing wall quantity calculation5232015-07-08
AnsweredARoad#133640Question about stress gradient2802015-07-08
AnsweredACulvert#133637No input field for notch (drip groove) when entering a passage culvert3792015-07-08
AnsweredAAbutPier#133627STM analysis1902015-07-08
AnsweredAAbutPier#133618Abutment pile foundation error in limit state design4832015-07-07