AnsweredQ&A #1265532014-05-14 15:01 · Views 352
Question about entering bridge bearing details
교량받침 상세 입력시 솔플레이트 규격 및 받침 규격을 입력하면 입력할때 마다 전체 값이 똑같이 변경이 되어 버립니다. 예로 P1 입력시 나머지 A1, A2, P2, P3, P4, P5 값이 같은 값으로 모두 변경되어 지네요. 확인 부탁드립니다.
Answer
안녕하세요. 한길아이티입니다. 지적하신 부분은 수정했습니다. 자동업데이트 후 확인해 보시기 바랍니다. 감사합니다.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ARcBridge | #126566 | Error message during 2D frame analysis | 218 | 2014-05-15 |
| Answered | ARcBridge | #126564 | Wall reinforcement drawing display error | 520 | 2014-05-15 |
| Answered | ARoad | #126572 | Follow-up question on K-type diaphragm | 206 | 2014-05-15 |
| Answered | ARoad | #126569 | Check of intermediate K-type diaphragm | 246 | 2014-05-15 |
| Answered | ACulvert | #126568 | Alignment report input for separate up/down-line culverts | 140 | 2014-05-15 |
| Answered | ACulvert | #126556 | Drawing output for circular columns | 176 | 2014-05-15 |
| Answered | ARcBridge | #126554 | Foundation error in wing wall drawing | 211 | 2014-05-15 |
| Answered | ARcBridge | #126548 | Wing wall reinforcement | 256 | 2014-05-14 |
| Answered | #126553 | Question about entering bridge bearing details · Currently viewing | 352 | 2014-05-14 | |
| Answered | ARoad | #126539 | Maximum reaction summary | 188 | 2014-05-14 |
| Answered | AAbutPier | #126535 | Foundation modeling error for multi-column pier | 189 | 2014-05-14 |
| Answered | AAbutPier | #126533 | About wing wall reinforcement | 159 | 2014-05-14 |
| Answered | AAbutPier | #126529 | Bearing horizontal force calculation error | 185 | 2014-05-14 |
| Answered | ARcBridge | #126517 | Drawing output error | 175 | 2014-05-13 |
| Answered | ACulvert | #126515 | General quantity error | 177 | 2014-05-13 |
| Answered | AAbutPier | #126528 | Foundation shear rebar detail error | 200 | 2014-05-13 |
| Answered | ACulvert | #126527 | Question about formwork quantity at culvert expansion joints | 606 | 2014-05-13 |
| Answered | AAbutPier | #126504 | Wing wall plate analysis | 256 | 2014-05-12 |
| Answered | AAbutPier | #126503 | Rebar waste allowance rate | 1,421 | 2014-05-12 |
| Answered | ARoad | #126502 | Wind load calculation? | 550 | 2014-05-12 |