수로암거 암버럭치환 깊이조정이 고정돼어 있는데 깊이변경을 할수없나요.

Answer

안녕하세요. 한길아이티입니다. 확인 해본결과 암버럭 치환깊이는 설계기준에 의한 값이며 고정이 되어 있어 조정하실수 없읍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredARoad#117934Importing integrated information2182013-04-30
AnsweredAAbutPier#117934Importing integrated information2182013-04-30
AnsweredARoad#117925Incorrect stringer shape1482013-04-30
AnsweredARoad#117923Warning: current out file unusual...1632013-04-30
AnsweredAAbutPier#117921Two-layer main rebar in the pier cap2482013-04-30
Answered#117918Culvert rock muck replacement · Currently viewing5072013-04-30
AnsweredACulvert#117915Rebar quantity mismatch1002013-04-30
AnsweredARoad#117905Deck slab reinforcement detailing1392013-04-30
AnsweredACulvert#117903Spacers for anti-flotation base slab2062013-04-30
AnsweredACulvert#117902Mn of intermediate wall1392013-04-30
AnsweredACulvert#117899Reinforcement drawing looks wrong1602013-04-30
AnsweredACulvert#117895Loads are applied incorrectly when opened in SAP1562013-04-29
AnsweredARcBridge#117914Is this design possible?1282013-04-29
AnsweredAAbutPier#117896About support angle2212013-04-29
AnsweredABeamDeck#117881File suddenly won't open2972013-04-27
AnsweredAAbutPier#117878Question about abutment2472013-04-27
AnsweredACulvert#117876Is this correct?1762013-04-27
AnsweredARcBridge#117873About railway live load1672013-04-27
AnsweredAAbutPier#117872Representation of pier coping beam2862013-04-26
AnsweredAWall#117868About the role of the retaining wall DB tab4442013-04-26
Sign in to ask