AnsweredQ&A #1097012012-04-16 13:46 · Views 233

Drawing display when setting grouting

그라우팅 설정하고 수량 전체 화면에 표시는 되는데 도면에 2구간만 표시되네여? 이건 어찌 해야되는지?

Answer

안녕하세요. 한길아이티입니다. 오류가 발견되어 수정되었습니다. 패치하시면 적용되십니다 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#109747Variable section1742012-04-17
AnsweredABeamDeck#109737Question about girder layout for a single-span bridge2742012-04-17
AnsweredARoad#109734Cannot open my working file1642012-04-17
AnsweredARoad#109736Steel box with sloped deck surface1652012-04-17
AnsweredARoad#109735File attachment1352012-04-17
AnsweredARoad#109732Follow-up question on generating the calculation report1522012-04-17
AnsweredARcBridge#109730Shear rebar spacing check1402012-04-17
AnsweredAAbutPier#109729About pier foundation reinforcement detailing2442012-04-17
AnsweredAAbutPier#109707Output error in wind load calculation in the structural calculation report2152012-04-17
AnsweredACulvert#109699Applying ultimate load in rebar quantity check at discontinuity1732012-04-16
AnsweredARcBridge#109698Double-track loading1682012-04-16
AnsweredARcBridge#109696Shear reinforcement in the top slab2372012-04-16
Answered양배수장#109694Question3052012-04-16
AnsweredABeamDeck#109715Automatic girder layout - check Excel error2712012-04-16
AnsweredARoad#109713Question about generating the calculation report1442012-04-16
Answered#109708Program output4562012-04-16
AnsweredAAbutPier#109705Why is minimum shear rebar placed in the shear check of pier columns?2682012-04-16
Answered#109701Drawing display when setting grouting · Currently viewing2332012-04-16
AnsweredACulvert#109700Regarding inquiry no. 1073642022012-04-16
AnsweredARcBridge#109691RL position, etc.1802012-04-16