AnsweredQ&A #1007202011-06-02 12:45 · Views 493
Calculation report 4 error in design of plate girder bridge with few girders
A-PLATE 소수주형교 설계시 계산서-4 단면응력검토에서 -, 부모멘트부 검토시 가로보 간격이 틀리게 들어감 -, 부모멘트 검토시 10.항복에 대한 안전도 검사에서 #REF로 나옴...
Answer
안녕하세요. 한길아이티입니다. 1. 구조계산서 4장 가로보 간격 오류 => 수정완료 (6.7) 2. #REF 뜨는 오류 => 수정 완료 자동업데이트 후 확인해 보시기 바랍니다. 수고하세요.
More in this list
| Status | Product | No. | Title | Views | Date |
|---|---|---|---|---|---|
| Answered | ARcBridge | #100751 | Rebar | 305 | 2011-06-03 |
| Answered | ARcBridge | #100749 | Section forces do not seem to be read | 274 | 2011-06-03 |
| Answered | ARcBridge | #100747 | Stirrup rebar check at end joint | 510 | 2011-06-03 |
| Answered | ACulvert | #100743 | Intermediate wall quantity error | 160 | 2011-06-03 |
| Answered | ACulvert | #100739 | Pile spring constant | 278 | 2011-06-03 |
| Answered | AAbutPier | #100752 | Question about applying couplers | 375 | 2011-06-03 |
| Answered | ACulvert | #100742 | Additional question on 100739 | 158 | 2011-06-03 |
| Answered | ACulvert | #100741 | Distribution rebar placement error in retaining-wall-type wing wall | 229 | 2011-06-03 |
| Answered | AAbutPier | #100733 | Missing rebar numbers | 311 | 2011-06-03 |
| Answered | AAbutPier | #100724 | Setting alignment offset distance | 285 | 2011-06-02 |
| Answered | AAbutPier | #100723 | Illustration error | 311 | 2011-06-02 |
| Answered | ARcBridge | #100712 | About general drawing output | 360 | 2011-06-02 |
| Answered | AAbutPier | #100710 | Error during foundation check | 264 | 2011-06-02 |
| Answered | ARoad | #100708 | Joint check | 284 | 2011-06-02 |
| Answered | ACulvert | #100736 | Inquiry about horizontal rebar check in bottom slab | 226 | 2011-06-02 |
| Answered | #100720 | Calculation report 4 error in design of plate girder bridge with few girders · Currently viewing | 493 | 2011-06-02 | |
| Answered | AAbutPier | #100707 | Seismic frame analysis error | 290 | 2011-06-02 |
| Answered | ARoad | #100706 | Joint design | 238 | 2011-06-02 |
| Answered | AAbutPier | #100705 | Calculation report output | 343 | 2011-06-02 |
| Answered | AAbutPier | #100701 | Can the bridge plan (including abutments and piers) be overlaid on the alignment and output? | 347 | 2011-06-01 |