Skip to content
AnsweredQ&A #994452011-04-28 15:48 · Views 580

Limited number of girders

거더 갯수 적용에 있어 최대 20개까지 가능하다고 되어있는데.. 거더갯수 15~20개를 적용하면 원인모를 다운이 발생합니다. 수고하세요..

Answer

안녕하세요. 한길아이티입니다. 지적하신 부분은 수정했습니다. 자동업데이트 후 확인해 보시기 바랍니다. 감사합니다.

More in this list

StatusProductNo.TitleViewsDate
AnsweredARcBridge#99491Problem with cross slope and corner rebar3902011-04-29
AnsweredACulvert#99488Importing section forces1942011-04-29
AnsweredAAbutPier#99486Foundation rotation option3432011-04-29
AnsweredAAbutPier#99477Calculating concrete compressive force (Cc) for hollow track-shaped sections5552011-04-29
AnsweredABeamDeck#99474Shoe illustration not displayed3682011-04-29
AnsweredAAbutPier#99465Seismic load for single-span abutment is not calculated automatically3332011-04-29
AnsweredACulvert#99462Inquiry about the calculation report2472011-04-29
AnsweredACulvert#99461Side ditch section check1902011-04-29
AnsweredACulvert#99460Quantity calculation not working, please check2092011-04-29
AnsweredACulvert#99457Please check this1772011-04-29
AnsweredACulvert#99455Cannot change scale when outputting drawings1792011-04-29
AnsweredAAbutPier#99454Automatic girder placement3252011-04-29
AnsweredACulvert#99451Error applying girder shear span2382011-04-29
AnsweredARcBridge#99449Corner cut treatment3842011-04-29
AnsweredARcBridge#99447Applying uniform member forces at start and end of rigid-frame bridge3592011-04-29
AnsweredACulvert#99446Approach slab reinforcement detailing error5072011-04-29
AnsweredABeamDeck#99443Question about sole plate slope3922011-04-29
AnsweredARoad#99453Applying moment loads in SAP4082011-04-28
AnsweredAAbutPier#99450About load definitions3342011-04-28
Answered#99445Limited number of girders · Currently viewing5802011-04-28
Sign in to ask