Jack-up stiffeners at pier

교각부 잭업보강재 계산에서 보강재 사용열수를 1개소로 적용하였는데 2개소로 나오며 유효폭 산정부분에서 d값이 들어갑니다 교량받침을 기준으로 반대편 잭업보강재의 간격이 들어가네요 확인 부탁드려요

Answer

안녕하세요. 한길아이티입니다. 지적하신 부분은 수정했습니다 절점 번호 오류 및 체크리스트 값 차이도 수정했습니다. 수고하세요.

More in this list

StatusProductNo.TitleViewsDate
AnsweredAAbutPier#249905Error in seismic analysis1822009-11-30
Answered#249903Structural calculation report chapter 44772009-11-30
AnsweredACulvert#249902Question about U-Type deliverables1512009-11-30
AnsweredATypeDesign#249900Allowable bending stress error for support members4362009-11-28
AnsweredAWall#249895In connection with ***3372009-11-28
AnsweredAAbutPier#249887Abutment reinforcement error2212009-11-28
AnsweredARoad#249885Question about structural calculation report checklist2232009-11-28
AnsweredAAbutPier#249883Seismic analysis model setup1342009-11-28
AnsweredABeamDeck#249880Drawing output error2652009-11-28
AnsweredAAbutPier#249878About clearance under the bridge1942009-11-28
AnsweredABeamDeck#249869Drawing output error3152009-11-27
AnsweredAAbutPier#249867Bearing seat check1602009-11-27
AnsweredAAbutPier#249866Are versions 2003 and 2007 incompatible?2432009-11-27
AnsweredARcBridge#249864Cannot proceed to next step from bridge dimensions2462009-11-27
AnsweredAAbutPier#249899Please check1882009-11-27
AnsweredAAbutPier#249896Values do not match1692009-11-27
AnsweredACulvert#249889Live load application error for culvert with anti-flotation key1532009-11-27
Answered#249884Jack-up stiffeners at pier · Currently viewing4802009-11-27
AnsweredAAbutPier#249868Horizontal rebar in approach slab2262009-11-27
AnsweredAAbutPier#249862Shear rebar spacing limit3022009-11-27
Sign in to ask